CONTACT US

13770259688

Dongtai Fu De Machinery Co., Ltd.
Address:No. 16 Zhenxing Road, Dongtai Development Zone
Mobile:+86.013770259688
Website:www.baby-stats.com
Email:ldyc@sina.com
Corporate news

Your current location:Home > Corporate news

  • Application and maintenance of pile hammer(2)
  • 2018/3/19¡¡Times of reading:[1468]
  • The effect of lower piston and molybdenum - lipid disulfide

    The pile hammer produces a lot of heat when used. To ensure the normal operation of the pile hammer, the upper piston must be lubricated manually by adding molybdenum lithium sulfide to the lower piston every one hour according to the requirements of the product specification, in addition to the forced lubrication of the upper piston by the oil pump.

    The functions of adding molybdenum-lithium bisulfide are as follows:

    1. Reduce the friction between lower cylinder and upper piston;

    2. Improve the sealing performance of piston and cylinder;

    3. It can play the role of heat dissipation.

    If we stick to the above three points, we can effectively extend the life of pile hammer.

Copyright:Dongtai Fu De Machinery Co., Ltd.¡¡Telephone:+86.013770259688¡¡Record number:Su ICP 18011909.¡¡Technical support:Sike Network
Telephone:+86.0515-88102095¡¡Website:www.fdmachine.com¡¡Email:ldyc@sina.com¡¡Address:No. 16 Zhenxing Road, Dongtai Development Zone
Disclaimer: Part of the content of this website is from the Internet, if it unintentionally involves third-party intellectual property rights, please call or write to inform, this site will be timely response and improvement.
久久亚洲 国产 综合aⅴ_亚洲欧美一级夜夜爽视频_一本精品日韩中文字幕在线_007午夜福利无码